Automated Sample Preparation System for Content Uniformity Testing含量均匀度自动样品前处理系统
- Units per batch
- 10–30
- Balance resolution
- 0.1 mg
制药样品前处理

Photo for reference; configuration may vary by order.
Model No. SMP-0004 · Pharmaceutical Laboratory Equipment
片剂粉碎与提取系统
Modified-release and hard tablets can be slow to extract completely by hand. This system mills 1–10 tablets per batch to below about 1 mm in 5–120 s, then extracts in 25–1000 mL with agitation at 50–300 rpm. Contact parts are stainless steel or polymer, cleaned by removal or wash cycle.
| Place of origin | China (dispatched from Shanghai) |
|---|---|
| Brand | Liquid International / OEM on request |
| Export packing | Fumigation-free plywood case or reinforced carton |
| Loading port | Shanghai / Ningbo (others on request) |
| Payment terms | T/T, L/C at sight (confirmed on quotation) |
| Trade terms | EXW, FOB, CFR, CIF, DAP |
Typical export terms — final terms are confirmed on the proforma invoice.
Modified-release and hard tablets can be slow to extract completely by hand. This system mills 1–10 tablets per batch to below about 1 mm in 5–120 s, then extracts in 25–1000 mL with agitation at 50–300 rpm. Contact parts are stainless steel or polymer, cleaned by removal or wash cycle.
| Parameter | Value |
|---|---|
| Tablets per batch 每批片剂数 | 1–10 |
| Particle size 粒径 | typically below 1 mm |
| Milling time 研磨时间 | programmable, 5–120 s |
| Extraction volume 提取体积 | 25–1000 mL |
| Agitation speed 振荡速度 | 50–300 rpm |
| Contact material 接触材质 | Stainless steel or polymer |
| Cleaning 清洁 | Removable parts or wash cycle |
| Power supply 电源 | 220 V, 50 Hz, about 0.3 kW |
| Model No. | SMP-0004 |
| Place of origin | China (dispatched from Shanghai) |
Chinese national standards (GB/T, JJG) and international standards referenced for this product type. Test reports and certificates are supplied with the quotation on request.
Fumigation-free plywood case or reinforced carton
Every unit is power-tested before packing; enclosed in shock foam and moisture barrier; wooden cases comply with ISPM 15.
Shanghai / Ningbo (others on request)
Full container load (FCL), less-than-container load (LCL) or air freight; complete export documentation provided.
Complete the form below — an export engineer will send technical configurations and a formal proforma invoice within 24 hours.
Single instruments, complete laboratories or government tenders — our export engineers prepare the configuration, proforma invoice and shipping documents.